8Prebid assignments
Projects cover EPC and Hybrid Annuity Mode packages, ranging from road strengthening and rehabilitation to multi-lane corridor development.
Project experience
Click and drag horizontally on smaller screens to view the full table.
| S. No. | Name of the work | Client |
|---|---|---|
| 01 | Balance Works of Rehabilitation and Up-gradation of Nakrekal to Nagarjuna Sagar section of NH-565 to 2L+PS/4L from Km 1.000 to Km 86.057 under NH(O) for the year 2020-21 in the State of Telangana on EPC Mode | Sudharma Infratech Pvt Ltd |
| 02 | Widening and strengthening to two lane with Paved shoulders including Geometrical Improvements from Km 491.000 to 525.200 of Raipur - Visakhapatnam section of NH-26 in the State of Andhra Pradesh on EPC mode | Sudharma Infratech Pvt Ltd |
| 03 | 4 Laning from km 0.000 to km 26.400 (along with 0.700 km approach towards NH 207 with interchange on NH4 at start point) of Bangalore to Malur Section of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana, in the state of Karnataka (Phase-I Package-I) | VDB Projects Ltd |
| 04 | Widening and Rehabilitation of existing two lane to four lane road Champa-Korba-Katghora Section of NH 149B, from Design Chainage 0.000 to 38.200, (Pkg I) under NH(O) in the state of Chhattisgarh on Hybrid Annuity Mode | Adani Road Transport Ltd |
| 05 | Development of Six Lane Boriguma - Dasamantpur Section of NH-130-CD Road from km 249+000 to km 293+000 under Raipur - Visakhapatnam Economic Corridor in the state of Odisha on Hybrid Annuity Mode (Package - OD-5) | Adani Road Transport Ltd |
| 06 | Development of Six Lane Koraput - Pattangi Section of NH-130-CD Road from km 293+000 to km 338+500 under Raipur - Visakhapatnam Economic Corridor in the state of Odisha on Hybrid Annuity Mode (Package - OD-6) | Adani Road Transport Ltd |
| 07 | Development of Six Lane Abhanpur - Magerlod Section of NH-130-CD Road from km 00+000 to km 42+852 under Raipur - Visakhapatnam Economic Corridor in the state of Chhattisgarh (Package - CG-1) on Hybrid Annuity Mode | Adani Road Transport Ltd |
| 08 | Development of Six lane Jalandhar Bypass starting from Kahlwan NH 03 ending at Kang Sahbu NH 703 via Sarmastpur NH 44, Madara NH 03 and Khajurla NH 44. Design Length 46.50 Km as part of North South Corridor decongestion in Punjab on HAM mode under BMP | Adani Road Transport Ltd |